2 bld schedulers; 1 removed

Discussions about the Calendar Tool at lds.org. Questions about the calendar on the classic site should be posted in the LUWS forum.
Post Reply
LesleyAnn
New Member
Posts: 24
Joined: Thu Oct 27, 2011 8:44 am

2 bld schedulers; 1 removed

#1

Post by LesleyAnn »

Prior to v2 launch our stake had 2 bldg schedulers listed; we switched everything over then one of the bldg schedulers was removed however his name/number happens to be THE one that pops up for members to call when a 'conflict' arises. Is this something WE can fix or is this something that needs to be done via MLS. Thank you!
User avatar
aebrown
Community Administrator
Posts: 15153
Joined: Tue Nov 27, 2007 8:48 pm
Location: Draper, Utah

#2

Post by aebrown »

lesleyann wrote:Prior to v2 launch our stake had 2 bldg schedulers listed; we switched everything over then one of the bldg schedulers was removed however his name/number happens to be THE one that pops up for members to call when a 'conflict' arises. Is this something WE can fix or is this something that needs to be done via MLS. Thank you!
It can't be fixed in MLS, and you can't fix it on the Calendar site, either. The problem is that right now the person who scheduled the event is listed (even though the text says to contact the "building scheduler"). This issue was reported and discussed in the thread Event conflict does not list building scheduler as contact. Hopefully it will get fixed soon.
Questions that can benefit the larger community should be asked in a public forum, not a private message.
lajackson
Community Moderators
Posts: 11475
Joined: Mon Mar 17, 2008 10:27 pm
Location: US

#3

Post by lajackson »

aebrown wrote:It can't be fixed in MLS, and you can't fix it on the Calendar site, either. The problem is that right now the person who scheduled the event is listed (even though the text says to contact the "building scheduler"). This issue was reported and discussed in the thread Event conflict does not list building scheduler as contact. Hopefully it will get fixed soon.
If the remaining building scheduler edits the event, will he become the contact that is shown? This may not be feasible for a large number of events, but it may serve as a workaround if there are only a few, even if he has to edit the event and then edit it back.
Post Reply

Return to “Calendar”