CUBS Transition Period Question

Discuss questions around local unit policies for budgeting, reconciling, etc. This forum should not contain specific financial or membership information.
allenjpl
Member
Posts: 311
Joined: Wed Apr 08, 2009 8:26 am
Location: Las Vegas, NV, USA

Postby allenjpl » Mon Oct 25, 2010 3:37 pm

Alan_Brown wrote:I'm not sure I agree. I was able to transmit multiple times on the 17th. I wasn't locked out until the system date rolled over to the 18th. So it seems to me that the system date is indeed a factor in the lockout.


This was my experience. It may or may not match up with anyone else's. After I realized I had forgotten to print the reports, I discovered that my Ward Clerk had downloaded MLS 3.2.3 recently, and the install folder was still on the church computer. I took that, along with the backups from 10/10, 10/16, and 10/17 and installed MLS at home on the 24th. I started with the data from 17th, but when I tried to access the data, I received the message that the financial stuff was locked out. So, I scrubbed the install, and restored from the 16th's. I received the same message. At that point, I logged out, changed the date on my computer to the 17th, and logged back in. I had full access. I printed out what I needed to, scrubbed the installation, and re-installed it, this time restoring from the 17th. As long as my computer date was before the 18th, I had full access. I breathed long sighs of relief, printed the info to both .pdf and hard copy, and scrubbed the install again.


Return to “Local Unit Finance”

Who is online

Users browsing this forum: No registered users and 1 guest