Calendar version 2.0.6 released... AGAIN!!

Posted: Thu Jan 26, 2012 3:04 pm
by jdcr256
Ok, we have released 2.0.6 again. When we released the first time, we caused an ugly bug that caused hard conflicts on resources that should not be conflicting. It took a while to iron out the issue, but it is fixed now. All the issues listed below for 2.0.6 are available again. Thanks for your patience and your help in reporting the original issue.

We have released version 2.0.6 of the Calendar application. This version is meant as another bug fix release, although it does contain one new feature enhancement that was scheduled for the 2.1 release.

2.0.6 includes the following changes:

- Added an 'Options' tab to the Settings page.
- Added an option to set Monday as the first day of the week (24-hour time is a more complex task that we are still working on).
- Added an option to set the setup/cleanup times of events to 'None', so you can choose to have one or the other.
- Building schedulers can no longer create multiple conflicting events during reservations.
- Importing all-day events through the Setup Wizard has been improved.
- Units that use buildings not assigned to their stake can now see the events in those buildings.

Posted: Fri Jan 27, 2012 5:53 am
by Biggles
I changed the option from Sunday to Monday, but the main calendar fails to populate any events! Changing back to Sunday it populates OK. I did close and clear the cache. I'm using Chrome, but haven't had time to try IE9. The small side calendar however does show that events are booked.

Have just tried IE9, but get pop up message about data being temporarily unavailable. Please try later.

Posted: Fri Jan 27, 2012 6:15 am
by scote
jdcr256 wrote:We have released version 2.0.6 of the Calendar application. ... Building schedulers can no longer create multiple conflicting events during reservations.

Hurrah! Thanks a ton!

Posted: Fri Jan 27, 2012 10:28 am
by russellhltn
Biggles wrote:I changed the option from Sunday to Monday, but the main calendar fails to populate any events! Changing back to Sunday it populates OK. I did close and clear the cache. I'm using Chrome, but haven't had time to try IE9. The small side calendar however does show that events are booked.

Have just tried IE9, but get pop up message about data being temporarily unavailable. Please try later.
Chrome works fine for me. IE9 causes an error when I toggle the checkbox, but it also works.

Posted: Fri Jan 27, 2012 11:24 am
by Biggles
RussellHltn wrote:Chrome works fine for me. IE9 causes an error when I toggle the checkbox, but it also works.
Tried it again just now, still got the same issues with both browsers! Must be a European thing. :-)

Posted: Thu Feb 02, 2012 4:45 pm
by jdcr256
Ok, the 2.0.6 release is back in production, after minor (that turned out to be major) complications. Take a look and let us know how we did.

Biggles, can you retry your issue and let me know how it goes. Hopefully it is not a "European thing", since that is part of the main audience the Monday feature was added for... :)

Posted: Fri Feb 03, 2012 5:25 am
by Biggles
I can confirm that it now populates correctly :)

However, as an experiment, I went back to January, it didn't populate. Going back to December, it populated. :confused: You will be.:rolleyes:

I double checked by using the Sunday option again, it populated in January OK again, before going returning to the Monday option. Very strange indeed!

Many thanks for giving us the option to use Monday as our start of the week!

Posted: Fri Feb 03, 2012 9:02 am
by jdcr256
Biggles, can you PM me your header information. You can get it by doing the following:

1. Log in to the calendar
2. Change the URL of your browser to https://www.lds.org/header
3. Copy the resulting page and send it to me

It's possible that there is a specific combination of events that breaks the javascript when Monday is the first day of the week. With your information, I can investigate.

Thanks for your good feedback.

Posted: Fri Feb 03, 2012 9:20 am
by Biggles
Duly sent!

Posted: Fri Feb 03, 2012 11:10 am
by russellhltn
It does seem to be event related. I can duplicate it for July, and only if I add events from one of three calendars. But I'll be darned if I can figure out the pattern. I did notice that only the month of July is affected - the "spill over" from June does display, but nothing in July or "preview" of Augest.